All of the tools you need, in a single tower.

Power, data, air, screens and tools at the exact point of use. Operators stop walking. Lines start moving.

01 — The hidden cost

Every operator walks away from the line for 25 minutes a shift, fetching what should already be there.

0h

Production hours lost per operator, per year, to searching and walking.

$0

Lost per station, per year: labor, idle machines, injuries and floor space.

$0

In avoidable ergonomic injury cost per station, every year.

02 — Engineered, not furnished

Built like a machine.
Take it apart and it proves it.

  1. 01

    Machined top cap

    Closes the mast cleanly at the 2000 mm line.

  2. 02

    Four corner extrusions

    59.5 mm aluminum profiles carry every load to the floor.

  3. 03

    Removable face covers

    Every cable runs inside the mast. Covers lift off for service.

  4. 04

    Gas-spring arms

    VESA 75/100 mounts for screens up to 38″, keyboards and scanners.

  5. 05

    Utility modules

    Outlets, USB, RJ45, breakers and compressed air at hand height.

  6. 06

    Anchored base plate

    264 × 264 mm footprint. Bolts to the slab.

Mast
210 × 210 mm
Frame
Extruded aluminum
Assembly
Bolt-together
Service
Front access

03 — Point of use

Every utility.
At hand height.

Power, data and air come up through the mast and out at the station, not across the floor or down from the ceiling. No trip hazards, no extension cords, no hunting.

  • 125 V outlets
  • IMO 15 A breakers
  • USB charging
  • Shielded RJ45
  • Compressed air

04 — The platform

Six towers.
One platform.

Same mast, same base, same utility spine. Pick the configuration your station needs today and re-tool it when the line changes.

05 — The math

Pays for itself before the next budget cycle.

Twenty-five minutes back per operator, per shift, compounds fast. Set it to match your line. The math is the same as our full ROI calculator.

Tower
Operators per tower
Annual savings
—
Break-even
—
3-year ROI
—

Investment —

Tell us about your line.
We’ll spec the towers.

Most orders ship within 2–3 weeks. Our engineers help you plan the layout.